VALUE: £25,000
LOCATION: Clackmannshire, Scotland
DURATION: 6 weeks
DESCRIPTION: 

Redecoration to five buildings at one of Scotland’s largest and most prestigious independent schools

Founded almost 200 years ago in 1818, making it the oldest co-educational boarding school in Scotland, Dollar Academy in Clackmannanshire is a day and boarding school for 1,200 boys and girls aged from five to eighteen.

The 70-acre school campus features numerous buildings of periodic and modern design, all set in a stunning location, with the breath-taking Ochil Hills providing the backdrop.

School Redecoration Brief

The redecoration project took just six weeks to complete in order to fit in with the school’s summer holiday break, limiting disruption to pupils and staff.

Between four and six Novus operatives from our Bathgate office worked simultaneously around the school campus in order to meet the agreed deadline.

The wide-ranging works included repainting the exterior of one building and the interior of four buildings on campus, as well as refreshing the road and playground markings throughout the school grounds.

Novus Painting and Decorating

The school’s Playfair building, with its distinctive neo-classical façade, was designed by the eminent Scottish architect William Henry Playfair.

The team repainted the main reception area and back office as well as the entranceway to the main assembly hall in the Playfair building, ensuring that all works carried out were sensitive to the original structure.

In the award-winning Maguire building, which houses the school’s art, PE and drama facilities, the team refreshed the gym hall, first aid room and entrance.

While in the Dewar building, which houses the science department, Novus operatives repainted the ground floor foyer area.

Crown Clean Extreme in both matt and acrylic eggshell were used to guarantee a long-lasting stain-resistant finish which can be easily cleaned, saving future maintenance costs.

The Junior School building required redecorating throughout and Novus was tasked with repainting seven classrooms as well as various corridor areas and the toilets.

Johnstone’s Acrylic Durable Eggshell and Acrylic Satin, which were specially mixed to shades from the Farrow and Ball range, were applied, providing a high performance tough coating – ideal for a busy school environment.

Project Challenges

The scale of the work in the Junior School building was one of the most challenging aspects of the project. This was due to other additional works being undertaken at the same time, including the laying of new flooring.

With only a very short period of time to complete the works and a strict deadline to work to, the team worked carefully around other trades on site to co-ordinate schedules.

As part of the project, we also refreshed the exterior of the Prep School building, including the roughcast facia and soffits. Crown Stronghold Smooth Masonry paint, guaranteed to last for 10 years, was specified in a neutral magnolia.

Designed to effectively resist dirt retention, the paint is anti-carbonation certified and offers excellent weather resistance – ensuring the Prep School will withstand the elements for years to come.

Crown Full Gloss in charcoal grey was used for the exterior woodwork.

As well as refreshing the campus road markings, the team also repainted the playground markings including hopscotch and other traditional playground games, for the Junior and Prep Schools, using a specialist Chlorinated Rubber paint in various colours.

It was vital that all the refurbishment work was completed before the start of the new school term and the limited timescale meant there was no room for any delay. We were impressed by Novus – the team worked closely with us throughout and altered their planned schedule of works at times to fit in around other trades on site, which made the whole process much smoother. The quality of finish is excellent, and the redecorated areas of the school look much brighter and fresher, and all completed within budget.

David Yuill-Kirkwood, building and contracts manager at Dollar Academy

Related Projects

We are Novus and this is our way
Constructing better environments for people to live, work and thrive /

INFORMATION ABOUT HOW WE USE COOKIES

We use cookies to make our site work. A cookie is a small file that we put on your device. These cookies allow us to distinguish you from other users of our website, which helps us to provide you with a good experience when you browse our website and allows us to improve our site.
OUR COOKIES
Necessary Cookies
Necessary cookies enable core functionality such as security, network management and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.
Analytical Cookies
Analytical Cookies help us to improve our website by collecting and reporting information about how visitors use our site. This helps us to improve the way our website works, for example by ensuring that users are easily finding what they are looking.
Read more about the individual cookies we use, their duration and how to recognise them in our Cookie Policy.